Document issued by the competent authority upon completion of construction work, certifying that the completed structure conforms exactly to the approved plans and documents of the building permit. Mandatory before any occupancy or use of the building.

Definition complete

The certificate of conformity is defined by Law No. 2019-576 of June 26, 2019 (Building and Housing Code, Articles 69-73) as the document certifying that the provisions of the completed structure correspond exactly with the approved plans and other documents of the building permit.

Conditions for Obtaining

  1. The project owner submits a declaration of substantial completion of works (end-of-project report)
  2. The building inspector issues a certificate of proper execution
  3. The building permit authority verifies conformity
  4. The certificate is issued by the competent authority before the structure is put into use

Importance

  • Any new or modified construction cannot be occupied without a certificate of conformity (Article 69)
  • If the certificate is not issued within 15 days without justified notification, the project owner may occupy the premises (Article 72)
  • A ministerial decree sets forth the procedures for issuance (Article 73)

Consequences of Non-Compliance

Occupying a building without a certificate of conformity exposes the owner to sanctions and may create problems upon resale or when obtaining insurance for the property.

Sources juridiques

Loi n°2019-576 du 26 juin 2019 instituant le Code de la Construction et de l'Habitat, Articles 69-73.

Questions frequentes

Can one occupy a building without a conformity certificate?
In principle no. However, if the certificate is not issued within 15 days without justification, the project owner may occupy the premises (Article 72 of Law 2019-576).

Besoin de conseils sur votre projet foncier ?

Nos experts vous accompagnent dans toutes les demarches.

Autres termes du glossaire

ADU — Attestation de Droit d'Usage CoutumierADU

The ADU (Attestation de Droit d'Usage Coutumier / Customary Right of Use Certificate) is the single, secure document that replaces the former Village Certificate as of January 1, 2025. Established by Decree No. 2021-784 and secured by the SIGFU (Decree No. 2021-862), it requires a triple signature (village chief, CVGFR president, developer) and a unique IDUFCI. The ADU is not a property title: it constitutes a provisional recognition opening the path to the ACD (Arrêté de Concession Définitive / Definitive Concession Decree) — the ACD published in the Land Register IS the Land Title. In practice, the time between ACD signature and its publication in the Land Register is often longer than the official 180 calendar days (BÂTIR N°004, 2022). Published ACD = published Land Title — same legal deed, two stages.

AFOR (Agence Foncière Rurale)AFOR

The Rural Land Agency (AFOR — Agence Foncière Rurale) is the public institution responsible for implementing rural land policy in Ivory Coast. It oversees land certification, registration of rural properties, and coordination of boundary demarcation and surveying operations.

Acte de vente

Legal document drafted by a notary that formalizes the transfer of land ownership between a seller and a buyer. The notarized deed of sale is mandatory and confers authenticity on the transaction.

Agence immobilière

Legal entity that must be established with a minimum share capital of 2 million FCFA held by Ivorian nationals, holding an approval from the Minister responsible for Housing and a financial guarantee from a bank or insurance company.

Aliénation (prix d'aliénation)

The alienation price is the sum that the buyer must pay to the State to obtain the Definitive Concession (ACD — Arrêté de Concession Définitive) of urban land. Calculated by an ad hoc commission, it corresponds to the market value of the parcel according to the official schedule.

WhatsAppFind my land